A finished lawn this week, not next season
Fresh-cut sod over properly amended and graded soil, with the irrigation tie-in a new lawn needs to root.
Why this holds up here
What the work looks like
Reference photo showing the typical work, not a photo of a completed job of ours. Job photos from our own sod installation work are on the way.
See our project gallery
How it works
Old turf and weeds stripped, soil tilled and amended.
Positive slope away from the house, raked smooth for tight seams.
Fresh-cut sod laid, seamed tight, and rolled for soil contact.
Schedule handed over and irrigation checked zone by zone.
FAQ
Light foot traffic after about two weeks. Full use and first mow usually around three to four weeks, depending on temperature.
Yes. Removal and disposal are quoted in the estimate, not added afterward.
Tell us about the project. We walk the property with you, talk through options, and follow up with a line-item quote.